Construction · Quality Control · Intermediate
Comprehensive construction project closeout checklist covering punch list, documents, inspections, and handover.
[ ] Normal Mode [*] Recovery Mode (erase all + rebuild) [ ] CD-ROM + Data [ ] Factory low-level
Purpose: provide a complete, step-by-step technical guide to obtain, prepare, install, and verify mpTools v1.0.5.2 for the Firstchip FC1178 and FC1179 SATA/IDE controller chips. This covers supported platforms, driver preparation, firmware/utility considerations, installation procedures for Windows and Linux, common issues, verification, and rollback/uninstallation. Assumptions made: target host uses FC1178 or FC1179-based controller, user has administrator/root privileges, and a basic ability to open device manager/terminal. Dates and package names reflect version v1.0.5.2 requested.
Always scan downloaded executable files with an antivirus before running. MPTools are legitimate utilities but are sometimes repackaged by third parties. firstchip fc1178 fc1179 mptools v1052 install
Re-run the process with "Capacity Priority" and a higher Bin Setting value. If the true capacity is still reduced, the NAND flash has permanent bad blocks, and the reduced capacity is the safe maximum.
The status bar will change colors (usually yellow for processing and green for success). This can take anywhere from 2 minutes to an hour depending on the size of the drive and the "Scan Level" chosen. Troubleshooting Common Issues [ ] Normal Mode [*] Recovery Mode (erase
Look for the "Controller Vendor" (FirstChip) and "Controller Part-Number" (FC1178 or FC1179).
Symptom: Controller not recognized; device shows as Unknown. Dates and package names reflect version v1
⚠️ : This process permanently erases all data on the USB drive. It is a low-level format that wipes the NAND chip entirely. If you'd like, I can help you:
Check Disk Management (diskmgmt.msc) for attached drives.
This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.
Get a printable PDF version ready to use today.
Download Printable PDFTurn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.
Rejoignez des centaines d'entreprises qui font confiance à Miratag pour leur gestion de la qualité.
Commencer l'Essai Gratuit